Kitchen
- New GE Café series refrigerator, dishwasher, range and microwave (July 2016)
- New cabinetry (July 2016)
- Tile backsplash and Sullivan quartz countertops (July 2016)
- New sink and garbage disposal (July 2016)
Master bedroom and bath
- Sunset deck with San Francisco and Oakland Hills views (Sept 2016)
- Vanity, toilet, bathtub and tile installed (Aug 2016)
- New carpet installed (Sept 2016)
- Walk-in closet system (Sept 2016)
Office/powder bath off kitchen
- Toilet, vanity and tile (June 2016)
- Built-in wine fridge (Dec 2018)
- Built-in floating desk and shelves with Ambrosia Maple (June 2018)
- New exterior door to back yard (July 2016)
General
- New upper roof installed (Feb 2019)
- Lower roof surface resealed (Feb 2019)
- All new dual-paned windows (July 2016)
- High-end turf and French drain (Forever Greens completed the work in Oct 2016)
- Rear redwood fence (July 2016)
- Restoration Hardware garden fountains (July 2016)
- New clumping bamboo hedge installed (2016)
- New front yard landscaping (Feb 2019)
- All new copper plumbing (April 2016)
- New 200 Amp electrical panel and recessed LED lights (March 2016)
- New handrails installed throughout home (Work completed by USA Metals in Jan 2019)
- New carpet installed in lower living room (Work completed by Dick’s Carpet in Dec 2018)
- New washer/dryer installed (Aug 2015)